Resource geography
Natural gas generation remains a major part of ERCOT’s supply, alongside wind concentrated largely in West Texas and the Panhandle, growing solar, nuclear, coal and rapidly expanding battery storage. Many wind and solar resources are far from the largest load centers, which is one reason transmission planning is central to Texas energy discussions.
Exact shares change every year; ERCOT publishes current figures, and those should be used rather than numbers repeated from older articles.
Large loads and planning
ERCOT and Texas policymakers have identified substantial requests from large loads, including data centers, industrial electrification and oil-and-gas operations. Not every request becomes a built facility, so forecasts carry significant uncertainty. Large-load interconnection, transmission expansion and equipment lead times for transformers and switchgear are active planning concerns.
Weather and reliability
Texas peak demand is driven heavily by summer heat, while winter extremes can stress both demand and fuel supply, as Winter Storm Uri showed in 2021. Reliability planning therefore considers weather scenarios, not only average conditions.
Key terms
- Large load
- A single facility with very high electricity demand, such as a data center or industrial plant.
- Reserve margin
- Available capacity above expected peak demand, used as a planning indicator.
- Transmission
- The high-voltage network that moves power over long distances.
Sources & further reading
- ERCOT Grid Insights — About ERCOT (November 2025)
- ERCOT — Current Planning Guide
- Public Utility Commission of Texas — Electricity