Compare with a realistic baseline
The baseline is what the site would otherwise do: continue operating, improve controls, replace equipment as necessary or expand according to its plan. Comparing a project only with an unnecessarily expensive or static alternative can overstate value.
Use the actual operating profile and tariff. Avoided energy purchases, demand reduction and export value are different quantities. Benefits should match the periods in which the system can actually operate.
Count full lifecycle costs
Include design, equipment, civil work, electrical and utility upgrades, financing, maintenance, insurance, controls and replacements. For storage, include losses, degradation and cycling assumptions. For generation, document resource estimates, availability and maintenance requirements.
Financing and tax assumptions must be disclosed and separately verified where relevant. Do not rely on unconfirmed incentives or treat a financing introduction as an approved offer.
Use financial measures with their limitations
Simple payback provides a rough recovery measure but omits the time value of money and may ignore costs after the apparent recovery date. Discounted cash flow and net present value assess cash flows over a stated horizon using a disclosed discount rate.
Internal rate of return can help compare some investments, but changes in cash-flow sign can produce ambiguous results, and project scale can alter interpretation. Financial measures do not replace technical feasibility, liquidity considerations or risk assessment.
Stress the assumptions and preserve flexibility
Sensitivity analysis should vary costs, resource output, tariffs, utilization, equipment life, replacement timing and financing. Compare conservative and central cases with the same methodology. A precise-looking output is not more reliable than its inputs.
Phasing can reduce commitment when load growth or utility timing is uncertain. A resilience benefit may be valuable, but its valuation needs a documented operating impact. If an option fails reasonable cost and risk assumptions, recommending no major capital project is a legitimate outcome.
Sources & references
- U.S. DOE / National Laboratory — Onsite Energy Analysis Using REopt
- U.S. DOE — Financing Microgrids in the Federal Sector